
The machine in question is a multi axis machining centre and the client required sea worthy packaging in general and aluminium barrier protection in particular. A heavy duty skid that weighed 2 tonnes was prepared on top of which the machine was mounted. All raw material was delivered at the site and the fabrication was done on site. The machine was to be exported to China.